Page 6 - bermite120204.htm
P. 6

EXECUTIVE SUMMARY



                   SCWC-Saugus2, and NCWD-11) and to replace one well (VWC-157) with a newer well
                   located in the western portion of the valley (west of the area shown on Figure ES-2).

                   ES-3 Objectives


                   In addition to meeting the requirements of the 97-005 Policy Memo (DHS, 1997), the
                   Purveyors have identified the following objectives that must be met by the pumping plan
                   for the impacted Saugus Formation production wells:

                   1.  Hydraulically contain perchlorate that is migrating westward in the Saugus Formation
                       from the Whittaker-Bermite property toward the impacted production wells.

                   2.  Hydraulically contain perchlorate that is present at wells MP-5 and VWC-157, which are
                       located downgradient of the impacted wells.
                   3.  Protect downgradient production wells that are currently not impacted.

                   4.  Restore the annual volumes of water that were pumped from the impacted wells before
                       they were shut down.

                   5.  Operate the impacted wells in a manner consistent with the Purveyors’ operational plan
                                                                              5
                       for the groundwater resources in the Santa Clarita Valley .
                   6.  If possible, pump one or more of the impacted Saugus Formation production wells in a
                       manner that also contains perchlorate migrating in the Alluvial Aquifer from the
                       northern portion of the Whittaker-Bermite property. Unlike the previous objectives, this
                       is a secondary objective for operating the impacted Saugus Formation production wells,
                       because other long-term remedies are being developed for the Alluvial Aquifer.
                       Consequently, this objective is not the basis for selecting or rejecting any given pumping
                       plan for the impacted Saugus Formation production wells.

                   The pumping plan that is developed and evaluated in this report for the impacted Saugus
                   Formation production wells is an interim program that will operate throughout the period
                   of evaluating, designing, and permitting long-term remedial actions for the Whittaker-
                   Bermite property and nearby groundwater. It is anticipated that the pumping plan for the
                   impacted Saugus Formation production wells will continue to be implemented after the
                   long-term remedies are in place on the Whittaker-Bermite property, in part because the
                   pumping plan is intended to meet the water supply needs of the Purveyors.


                   ES.4 Methodology

                   The containment evaluation for the impacted Saugus Formation production wells was
                   performed using the regional groundwater flow model for the Santa Clarita Valley
                   (Regional Model). The Regional Model’s construction and calibration are discussed in detail
                   in Regional Groundwater Flow Model for the Santa Clarita Valley: Model Development and
                   Calibration (CH2M HILL, 2004a). The Regional Model simulates the temporal and spatial
                   variations in groundwater flow patterns in three dimensions, including the recharge and


                   5 This operational plan is described in the documents titled Urban Water Management Plan 2000 (Black & Veatch, 2000) and
                   Santa Clarita Valley Water Report 2003 (Luhdorff & Scalmanini Consulting Engineers, 2004).



                   RDD/041840005 (CLR2612.DOC)                                                            ES-3
   1   2   3   4   5   6   7   8   9   10   11