PROCESS  BQUIPMENT  AND  INSTALLATION              PAGE   1

            PROJECT:  West  Coast  Basis
            DATE  PREPARED:  16  OCT  1998   PREPARED  BY:   DEM   PROJECT  DATABASE:  RIC
            ======----------------======================--===========------------------====
     I      REFERENCE  NO:  107   HORIZ                       CATEGORY/TYPE:  HT  /HORIZ-DRUM
            USER  EQUIPMENT  TAG_:                            ESTIMATED  COST:  USD    9600

                                                 ITEM
                    SHE4L  MAT'L  A  515                CAPACITY           660.00  GALLONS
                    DIAMETER             4. 00  FEET    LENGTH               7.00  FEET
                    DESIGN  TEMP.      650.00  DEG  F   DESIGN  PRESS       15.00  PSIG
                    APPLICATION  CONT                   THICKNESS            0.31  INCHES
                    TOTAL  WEIGHT        2400  LBS
                                              INSTALLATION
                  :  INSTALLATION    :  DIRECT  MAT'L:   DIRECT  FIELD  LABOR   :TOTAL  DIRECT  :
                      ACCOUNT                USD       MAN-HOURS     USD            USD  ··
                    EQUIPMENT                9600            33      2763          12363
                    PIPING                      0             0         0              0
                    CIVIL,SITEWORK              0             0         0              0
                    STEELWORK                   0             0         0              0
                    INSTRUMENTATION             0             0         0              0
                    ELECTRICAL                  0             0         0              0
                    INSULATI_ON                 0             0         0              0
                    PAINTING                    0             0         0              0
                  :  TOTAL  DIRECT  COST:    9600            33      2763          12363



   I  I


























                                       CHEVRON MAKES NO WARRANTY
                                       IMPLIED OR EXPRESSED, AS TO
                                       ESTIMATES PROVIDED HEREIN.
                                       CHEVRON STRONGLY SUGGESTS THAT
                                       THE CITY OF SANTA CLARITA SHOULD
                                       MAKE IT'S OWN DETERMINATION AS TO
                                      THE SCOPE OF WORK NECESSARY TO
                                      ACCOMPLISH THE GOAL SET FORTH AND
                                      THE COST OF SUCH WORK.