Page 5 - cn9501
P. 5

Den  (1st  bedroom)

              (Note:      closet  door  broke  during  earthquake-there  is  a
              replacement  door  in  the  barn)



              Added:  paneling  (Note:           broken  in  earthquake-went  into  No.2
              dumpster)
                                                         ##




              Added:      bookcase,  light  switches
                                                         ##
              SERVICE  ROOM  (2nd  bedroom)


              *Utility  sink  and  2  cupboards
              Added:      furnace,  carpet,  paneling
              (Note:      had  to  knock  hole  in  wali  to  replace  piping-plaster
              fell  off  during  the  earthquake.             Some  of  the  paneling  feli
              and  was  placed  in  the  No.  2  dumpster)

              Left:     antique  armoire
                                                         ##
              Kitchen
              *sink  only  and  small  drainboard
              *dumb  waiter  (in  floor)
              *butler's  pantry  - pie  safe  and  drawers

              Added:      cabinets,  stove  hood,  electricity  and  wiring,
              shelving,  and  light  fixtures
                                                         ##

              Bathroom  and  Porch
              *toilet  only
              *water  heater
              *screening  only


              Added:      glass  for  windows  on  porch,  pull-chain  tank,  shower,
              sink,  shelving.
                                                         ##


              Dining  Room
              *fireplace  and  mantle

              Added:      carpeting  and  padding
                                                         ##
   1   2   3   4   5   6   7