Page 3 - lw3365
P. 3
Ore
Photos for additional Identification of Parts
l} Ore Wagon Assembly for Instruction #1
2} Brake Sub-Assembly for Ore Wagon
3) Tank Brake Sub Assembly
4} Ore Wagon Assembled with Front Drawbar omitted for clarity
color
3
Spread out the parts for this
step. Paint detail shown and
let dry before cementing
1. Cement 26 and 27 to 28.
2. Now cement 29 to 30. When dry,
cement completed tank to 28.
3. Next, cement 31 to the front of
28 as shown.
4. Cement 32R to right side of 28, then
33 to left side of 34L and cement 34L
Tank Brake to left side of 28.
Ratchet 5. Finally cement 35 to the underside of
33 28, then set aside to dry.
Water Tank
Water Tank
4
1. Slide-do not cement 36
onto the long pin as shown.
2. Now slide 37 onto the long
pin and down into slot in
36, (shown in the highlighted areal then cement
axle 37 on to pins on wagon bed.
3. Next, cement 38 onto 36 *2
4. Cement 39 onto 37, then
hook 40 onto bar on 39 and
cement 40 onto supports as shown. *2, see sub assy above
5. Cement 41R & 42L to the right
and left ends of 40. *2
6. Slide 43 through the ratchet and
locate pin on 39 into hole 43, then
cement into place.
7. Install 44 to front axle and 45 to rear axle and
cement 46 to axles as you did on the frieght wagons.
NOTE: THERE ARE TWO FRONT HUBS AND TWO REAR HUBS AND ARE NOT
*2 See website for alternate method of assembly.