Page 872 - tesoro_sdeir0218
P. 872
Draft Supplemental EIR
Tesoro del Valle (Phases A, B, C)
SUMMARY OF VOLUME-TO-CAPACITY RATIOS AND LEVELS OF SERVICE AM AND PM PEAK HOURS LOS ANGELES COUNTY INTERSECTIONS: 1999 TRACT MAP ALTERNATIVE
TABLE 6-1
2 4 3 Change Year 2024 w/Mitigation Change Year 2024 w/Related Change V/C Measures V/C Projects V/C Significant Significant Mitigated [(4)-(1)] LOS V/C Impact [(3)-(1)] LOS V/C Impact [(2)-(1)] No 0.175 E 0.919 Yes 0.225 E 0.969 No 0.010 No 0.542 F 1.447 Yes 0.942 F 1.847 Yes 0.013 Yes 0.005 B 0.621 Yes 0.863 F 1.479 No 0.009 No 0.158 E 0.926 Yes 1.332 F 2.100
Year 2015 w/ Alternative LOS V/C C 0.754 E 0.918 B 0.625 C 0.784 A 0.298 A 0.436 A 0.440 A 0.460 C 0.703 B 0.663 C 0.721 A 0.536 A 0.586 B 0.644
1 Year 2015 Existing LOS V/C C 0.744 E 0.905 B 0.616 C 0.768 A 0.296 A 0.435 A 0.440 A 0.460 B 0.689 B 0.647 B 0.691 A 0.517 A 0.557 B 0.626
Peak Hour AM PM AM PM AM PM AM PM AM PM AM PM AM PM
The Old Rd/I-5 SB Ramps The Old Rd/Rye Cyn Rd Copper Hill Dr/Decoro Dr Tesoro Del Valle Dr–Rio Norte Dr/Copper Hill Dr
Intersection The Old Road/Magic Mountain Pkwy I-5 SB Ramps/Magic Mountain Pkwy Avenida Rancho Tesoro/Copper Hill
No. Dr Source: LLG 2017. R:\Projects\BLC\3BLC000100\Draft EIR\6.0 Alternatives.docx
1 2 3 4 6 7 8

