Page 1309 - trc_centennial_deir201705
P. 1309

5.10  Traffic, Access, and Circulation
                   RAMP PEAK HOUR VOLUMES AND V/C SUMMARY – EXISTING (2014 AND 2015) PLUS PROJECT
                         SOUTHBOUND/WESTBOUND
                TABLE 5.10-22















                            AM Peak Hour  PM Peak Hour  AM Peak Hour  PM Peak Hour  Project   Impact?   V/C   Vol   V/C   Vol   Cap  Lanes   ADT  LOCATION   V/C   Vol   V/C   Vol   Calgrove Blvd                                                 SB Off-Ramp      0.09   130  0.07    100  1,500   1  2,100  Existing  0.11    160  0.08    120   Project          5       9           31       38       10   Traffic   Existing Plus      0.09   135  0.07    109  1,500   1  2,131   0.13    198  0.







                         NORTHBOUND/EASTBOUND











                              Cap       1,500       1,500           2,000       2,000           4,000       4,000           1,500       1,500







                              Lanes       1       1           1       1           2       2           1       1      R:\Projects\PAS\CEN\000306\Draft EIR\5.10 Traffic-051217.docx








                              ADT       2,650   245   Plus   2,895       On-      5,200   1,491   Plus   6,691       On-      28,472   5,070   Plus   33,542       On-      4,050   1,349   Plus   5,399










                              LOCATION  Calgrove Blvd NB On-  NB       NB                 NB   St




                                   Ramp   Existing   Project Traffic   Existing   Project    Project V/C   SR-14   SB   Ramp   Existing   Project Traffic   Existing   Project    Project V/C   SR-210   WB   Ramp   Existing   Project Traffic   Existing   Project    Project V/C   Roxford   Ramp   Existing   Project Traffic   Existing   Project    Project V/C
   1304   1305   1306   1307   1308   1309   1310   1311   1312   1313   1314