THE BAKER COMPANY
CONSTRUCTORS
Proposal For Furnace Stacks
Newhall Oil Refinery
$480.00
Concrete Block Groutin 4 Cubic Yards $320.00
Blocks x x 16" 300 Gra Medium Wei ht $600.00
Steel Rebar 5/8" 24 Pieces @ 20 Feet $240.00
Steel Rebar 1/2" Pieces @ 20 Feet $70.00
Steel Railroad Pencil 30 Pieces @ 8 Feet $100.00
20 Sacks $160.00
4 Scoo s $75.00
Jack Hammer 40 lbs. With Chisel Bit 3 Da s $210.00
Total Material Cost $2,255.00
Scope of Work:
Demo two (2) existing stacks (24' high by 3' x 3' wide).
2. Chip and clean 3,450 existing used brick for reuse.
3. Remove debris from work area (dump fees and site remove
4. Rebuild both stacks as per attached plan.
5. Does not include excavation of existing footings.
Note Estimated value of existing cleaned bricks=
Note 2: Materials supplied by client will be deducted from total cost.
CHEVRON MAKES NO WARRANTY
IMPLIED OR EXPRESSED, AS TO
ESTIMATES PROVIDED HEREIN.
CHEVRON STRONGLY SUGGESTS THAT
THE CITY OF SANT A CLAR IT A SHOULD
MAKE IT'S OWN DETERMINATION AS TO
THE SCOPE OF WORK NECESSARY TO
Kevin Connington ACCOMPLISH THE GOAL SET FORTH AND
Phone (805) 298-9136 THE COST OF SUCH WORK.
19215 Vicci Street
Canyon Country, CA 91351
License #554962