Page 28 - ch9802b
P. 28

THE  BAKER  COMPANY

                                        C  O  N S  T  R  U C T  O  R  S



                             Proposal For 'Beehive' Downdraught Furnaces


                                              Newhall Oil Refinery

                                               MATERIAL ESTIMATE
                                                            n!if" QUantity
                Cement                      10  Sacks  Plastic                               $100.00
                Sand                          3  Scoo  s  D  Plaster                          $60.00
      ,         Bricks                     200  Used                                         $150.00
    ,   I
                Makita Grinders               2  4 Inch  For Grindin  Mortar Joints          $300.00
                Diamond Blades                4  All Pur  ose                                $300.00
                        See Note #1        TBD                                               $300.00












                                                                                            Date:  07120/98
                Furnace Description:
                                                                               CHEVRON MAKES NO WARRANTY,
                Furnace #1:    68 brick long per course by 36 courses high.    IMPLIED OR EXPRESSED, AS TO THE
                Furnace #2:    68 brick long per course by 30 courses high.    ESTIMATES PROVIDED HEREIN.
                                                                               CHEVRON STRONGLY SUGGESTS THAT
                Scope of Work:                                                 THE CITY OF SANTA CLARITA SHOULD
                                                                               MAKE IT'S OWN DETERMINATION AS TO
                1.    Reg rout all exterior joints (approximately 4,500 brick).   THE SCOPE OF WORK NECESSARY TO
                2.    Repair damaged areas as necessary (exterior only).       ACCOMPLISH THE GOAL SET FORTH AND
                3.    Epoxy all structural cracks (exterior only).             THE COST OF SUCH WORK.

                Note 1:    Epoxy estimate may vary; will confirm cost per amount used.  $300.00 is a
                           ballpark estimate.  Will adjust cost after work is completed.
                Note 2:    Suggest inspection of interior of furnace for additional reinforcement.
                           Example:  Grouting of deteriorated joints, epoxying structural cracks.
                Note 3:    Suggest sand blasting of exterior bricks before regrouting.
                Note 4:    Furnace #1  - Client to supply crane to lift bell unit off of furnace to realign the
                           circumference of brick cap (as discussed with Paul).
                Note 5:    Suggest inspection of existing footings for possible structural reinforcement.
                Note 6:    Material supplied by client will be deducted from total cost.





                                                    Kevin Connington
                                                  Phone (805) 298-9136
                                                   19215 Vicci Street
                                               Canyon Country, CA  91351
                                                    License #554962
   23   24   25   26   27   28   29   30   31   32   33