     Pioneer Oil Refinery: California Star Oil Works                                                kit #RLW-1680

        CONDENSER

                                                          The condenser was a seventy-five-foot long trough containing four hundred
                                                          feet of iron pipe. Each still was connected to this piping and vapor from the
                                                          stills  was  passed  into
                                                          and through these pipes
                                                          condensing  into  liquid,
                                                          which  passed  from  the
                                                          condenser piping to the
                                                          Tail   House.   Water
                                                          entered  the  trough  at
                                                          the  east  end  (beyond

      Assembled Condenser; pipes at right go to Tail House; legs are “sacrificial.”   Still  No.  4)  and  there
      .                                                   was an exit pipe on the
        west end (Tail House end.) It is unclear where the water went from this point, but it
        may have been some of the water pumped from the site to the wells in Pico Canyon.
        Prior  to  beginning  assembly,  paint  or  stain  the  laser-cut  wood  parts  (recommend
        Floquil Railroad tie Brown or equal) and the condenser piping and  metal bulkhead
        (flat black, with dry-brush highlighting, and application of Rustall on the bulkhead.)
        Note: The “legs” are sacrificial. (See “Site” section.)                     Condenser seen from the hill above the stills. (SCVHS)

                                        Glue frames C-1 to side C-3, which is the side
                                        which  faces  the  stills,  aligning  with  vertical  score  marks.  Note  the  orientation:  the  notch  in  the
                                        frames goes on the C-3 side, and the closely spaced pair of frames are on the right end when viewed
                                        from the C-3 side. After frames are glued in place
                                        one side, slip opposite side (C-2) into opening and
                                        glue to other side of frames. Use clips as shown to
                                        assure  frames  are  square  with  sides.  Then  add
                                        bottom  of  trough  (C-4),  sliding  in  from  the  end
                                        and  turning  to  fit  tightly  between  the  sides  and
                                        tight to the bottom of the frames.
                                        Glue clear plastic “water” (C-) to top of nubs on
        .                               the  top  of  the  resin  piping  casting  with  small
        droplets of CA glue. When set, apply a few drops of white glue into bottom of trough and
        slide piping into condenser. Make sure the row of pipe ends facing upwards are on the C-
        3 side (still side) of the trough as shown.

                                             Drill #76 holes in the Condenser Bulkhead  where shown
                                             on  right.  Paint  the  bulkhead  flat  black  (Vallejo  NATO
                                             Black)  then  add  an  application  of  Rustall  after  paint
                                             thoroughly dries. Bend brass wire to form the two spouts
                                             and  glue  in  place  in  the  upper  two  holes.  (Remaining
                                             piping will be installed when condenser is fitted to “site”.)
                                             Glue  in  place
                                             in  last  frame
                                             of Condenser.

                                             Add  stringers
                                             C-7 & C-8 as                                       .Drill #76 holes where shown;
                                             shown.                                             work carefully in 3D printed
       .                                                                                        acrylic plastic. Form brass wire
        Parts C-9 & C-10 will be installed later after Condenser and                            “faucet spouts” and install in upper
        Stills are placed on the Site Base. (See “SITES” section of                             two holes.
        instructions.)


                                                            .


     © 2016 Republic Locomotive Works                                                                      1680 – pg. 10
   5   6   7   8   9   10   11   12   13   14   15