Mogul 1629 Report
Norm Harris
July 21, 1997
1. Chris· DeWitt Supplemental Report Provi~ed additional
information on restoration task details and estimated
labor/material costs. In process of extracting information needed
for static display restoration plan.
2. Met with cabinetmaker, Mike Btrd, who provided a quote to
replace the woodwork in the cab: $1300. {Does not include cost of
steel to replace rusted panels and labor to weld, finish, and
paint). Recommend that work commence immediately on this portion
l1 of the project. Steel wi 11 be needed, not to exceed $500,
initially for floor and rusted panels.
I .
3. In process of obtaining a quote on replacing the sheet metal
on the boiler and simulated insulation (polystyrene).
Installation, finishing, and painting are required as well.
4. Cost of building to protect locomotive and tender is being
sought.
5. Restoration costs for remainder of locomotive and tender are
D being determined.
6. Invoice received from Cal-OSHA for inspection on 4/29/97 for
0 $210.