Page 9 - sfdcoronersinquest
P. 9

.....  ··-··  ··-










            1
                   Water.
            2

            3

            4
                          A      Since 1886.
            5
                                 Were you Chief Engineerof the  Water Departmentat the
            6

            7
                          A      I  was.
            8
                          Q.     And at the      time that the  site was selectedfor theSt.
            9
                   Francis Dam?
          10
                         A       Yes  sir.
          11
                          A      How was the site of the st. Francis                 l)a1I  selected?
          12
                          A       We  observed that therewas a largewater spaceat the
          13
                   camp; we  had a  campin there when wewere building theaqueduct,
          14
                   contained there,         I  think. for sixyears,                I was very familiar
          15                                                                                     therethat
                   with the topography          there andI  havehad a habitation
          16
                   long; I  virtually        made.,, habitation tk9fl becauseI lived moreor
          17
                   less on the aqueduct          while it     was underconstruction.                I am
          18
                   speakingnow of the Los A.ngeJ.es  Aqueduct.I  was Chief Engineer on
           19
                   that and designerand constructor of it.
           20
                          Q.     How wasthe properrtythere where the damwas  erected
           21
                   acquired by the City of Los Angeles?
           22
                          A      By purchase.
           23
                                 Who were tu engineerswho actually located the site
           24

           25
                          A
           26
                   organization.          We  have a.  l.aqe and activeorganizationin the department
           27
                                and they are constantly            busy all the time.

           28
                          Q.     Do you recall thenames of the engineerswho--.U,
           29
                   madethe tests there for the location of thedam?
           30
                          A       Stanley Dunhamwas 't1l.e  constructing engineerin charge
           31
                   of the construction          and also thepreparationof this site.
           32
                          Q.      Did anyone assist him?


                                                                      -7-
   4   5   6   7   8   9   10   11   12   13   14