Page 886 - tesoro_sdeir0218
P. 886
Draft Supplemental EIR
Tesoro del Valle (Phases A, B, C)
SUMMARY OF VOLUME-TO-CAPACITY RATIOS AND LEVELS OF SERVICE AM AND PM PEAK HOURS LOS ANGELES COUNTY INTERSECTIONS:
REDUCED DEVELOPMENT AREA ALTERNATIVE
TABLE 6-3
2 4 3 Year 2024 Change w/Mitigation Change Year 2024 w/Related Change V/C Measures V/C Projects V/C Significant Significant Mitigated [(4)-(1)] LOS V/C Impact [(3)-(1)] LOS V/C Impact [(2)-(1)] Yes 0.005 C 0.749 Yes 0.162 E 0.906 No 0.008 No 0.418 F 1.323 Yes 0.818 F 1.723 No 0.009 Yes 0.004 B 0.620 Yes 0.860 F 1.476 No 0.007 No 0.155 E 0.923 Yes 1.328 F 2.096
Year 2015 w/ Alternative LOS V/C C 0.752 E 0.914 B 0.623 C 0.779 A 0.298 A 0.436 A 0.440 A 0.460 B 0.699 B 0.658 C 0.713 A 0.531 A 0.579 B 0.639
1 Year 2015 Existing LOS V/C C 0.744 E 0.905 B 0.616 C 0.768 A 0.296 A 0.435 A 0.440 A 0.460 B 0.689 B 0.647 B 0.691 A 0.517 A 0.557 B 0.626
Peak Hour AM PM AM PM AM PM AM PM AM PM AM PM AM PM
Mountain Mountain
The Old Rd/I-5 SB Ramps The Old Rd/Rye Cyn Rd Old SB Copper Hill Dr/Decoro Dr Dr/Copper Hill Dr
Intersection Road/Magic Ramps/Magic Tesoro Del Valle Dr–Rio Norte Avenida Rancho Tesoro/Copper
No. The Pkwy I-5 Pkwy Hill Dr Source: LLG 2017.
1 2 3 4 6 7 8 R:\Projects\BLC\3BLC000100\Draft EIR\6.0 Alternatives.docx

