Page 9 - tesoro_sdeir0218
P. 9

Tesoro del Valle (Phases A, B, C)
                                                                                            Draft Supplemental EIR

               Section 7.0    Other CEQA Topics .......................................................................................... 7-1

                              7.1    Environmental Effects ............................................................................. 7-1
                                     7.1.1  Environmental effects that can be Mitigated to Less Than
                                            Significant Levels ........................................................................ 7-1
                                     7.1.2  Significant Environmental Effects That Cannot Be Avoided
                                            If The Proposed Project Is Implemented ..................................... 7-2
                              7.2    Significant Irreversible Environmental Effects ........................................ 7-3
                              7.3    Growth-Inducing Impacts ........................................................................ 7-4


                              List of EIR Preparers and Contributors .......................................................... 8-1
                              8.1    EIR Preparers ......................................................................................... 8-1
                                     8.1.1  County of Los Angeles (Lead Agency) ....................................... 8-1
                                     8.1.2  Psomas (EIR Preparation) .......................................................... 8-1
                              8.2    EIR Contributors ..................................................................................... 8-1
                                     8.2.1  Sikand (Civil Engineering, Drainage, Sewer Area Study) ........... 8-1
                                     8.2.2  RMA GeoScience (Geological Consultant) ................................. 8-1
                                     8.2.3  PACE (Water Quality Technical Report) ..................................... 8-2
                                     8.2.4  Linscott, Law & Greenspan, Engineers (Traffic Study) ............... 8-2
                                     8.2.5  Newhall County Water District (Water Supply Assessment) ....... 8-2
                                     8.2.6  Vista Environmental (Air Quality, Greenhouse Gas
                                            Emissions, Energy) ..................................................................... 8-2
                                     8.2.7  Murow CM (Dry Utilities) ............................................................. 8-2
                                     8.2.8  Leatherman BioConsulting (Biological Resources) ..................... 8-2
                                     8.2.9  Placeworks (Design) ................................................................... 8-2
                                     8.2.10  BrightView Design Group (Landscape and Parks Design) ......... 8-2

                              8.3    Project Applicant ..................................................................................... 8-2
                                     8.3.1  BLC TESORO LLC ..................................................................... 8-2
































               R:\Projects\BLC\3BLC000100\Draft EIR\!TOC.docx   v  i  i                         Table of Contents
   4   5   6   7   8   9   10   11   12   13   14