Tesoro del Valle (Phases A, B, C)
Draft Supplemental EIR
TABLES
Table Page
1-1 Summary of Environmental Impacts and Standards and Guidelines and
Mitigation Measures (MMs) for Tesoro del Valle (Phases A, B, C) ................................ 1-7
2-1 Required Discretionary Approvals and Permits ............................................................. 2-5
2-2 Comments on the Notice of Preparation ........................................................................ 2-6
3-1 Required Discretionary Approvals and Permits ........................................................... 3-10
3-2 Related Projects List .................................................................................................... 3-12
4-1 Tesoro Del Valle Residential Units: 1999 Approved Development ................................ 4-4
4-2 Summary of Built and Un-built Approved Residential Units by Phase ........................... 4-5
4-3 Land Use and Zoning Comparison ................................................................................ 4-6
4-4 Required Discretionary Approvals and Permits ........................................................... 4-14
4-5 Jurisdictional Permits and Agreements ........................................................................ 4-15
4-6 Park and Recreation Amenities .................................................................................... 4-16
4-7 Construction Phasing ................................................................................................... 4-42
5.3-1 1999 Final EIR Maximum Daily Short-Term Emissions (lbs/day) ................................ 5.3-2
5.3-2 1999 Final EIR Long-Term Emissions (lbs/day) .......................................................... 5.3-3
5.3-3 Summary of Air Quality Data ....................................................................................... 5.3-8
5.3-4 Sensitive Receptors .................................................................................................... 5.3-9
5.3-5 National and California Ambient Air Quality Standards ............................................. 5.3-10
5.3-6 South Coast Air Basin Attainment Status .................................................................. 5.3-12
5.3-7 SCAQMD Regional Emissions Thresholds of Significance ....................................... 5.3-17
5.3-8 SCAQMD Localized Criteria Pollutant Thresholds of Significance ........................... 5.3-19
5.3-9 CalEEMod Model Land Use Parameters .................................................................. 5.3-21
5.3-10 CalEEMod Model Construction Parameters.............................................................. 5.3-22
5.3-11 Phases A, B and C Maximum Daily Construction Emissions .................................... 5.3-32
5.3-12 Long-Term Operational Project Criteria Pollutant Emissions .................................... 5.3-34
5.3-13 Combined Construction and Operational Maximum Daily Emissions ....................... 5.3-35
5.3-14 CO Hot Spot Concentrations ..................................................................................... 5.3-36
5.3-15 Localized NOx Concentrations at Nearby Receptors Prior to Mitigation ................... 5.3-40
5.3-16 Mitigated Localized NOx Concentrations at Nearby Receptors ................................ 5.3-41
5.3-17 Localized CO Concentrations at Nearby Receptors.................................................. 5.3-42
5.3-18 Localized PM10 and PM2.5 Concentrations at Nearby Sensitive Receptors............ 5.3-43
5.3-19 Construction-Related Cancer Risks at Nearby Sensitive Receptors......................... 5.3-45
5.4-1 Existing Vegetation Types and Other Areas ............................................................... 5.4-9
5.4-2 Summary of Jurisdictional Waters ............................................................................. 5.4-27
5.4-3 Special Status Plant Species Occurring in the Project Region ................................. 5.4-33
5.4-4 Special Status Wildlife Species Occurring in the Project Region .............................. 5.4-37
5.4-5 Vegetation Types and Other Areas Impacted by Project Grading Activities ............. 5.4-73
5.4-6 Vegetation Types and Other Areas Impacted by Fuel Modification Activities ........... 5.4-74
5.4-7 Comparison of Vegetation Impacts 1999 Approved Project Versus Current
Design ....................................................................................................................... 5.4-75
5.4-8 Impacts to U.S. Army Corps of Engineers/Regional Water Quality Control
Board Jurisdictional Waters .................................................................................... 5.4-103
5.4-9 Impacts to California Department of Fish and Wildlife Jurisdictional Waters .......... 5.4-104
5.5-1 Paleontological Sensitivity ......................................................................................... 5.5-13
5.6-1 Construction-Related Energy Use ............................................................................... 5.6-7
5.8-1 Comparison of Worldwide GHG Emissions ................................................................ 5.8-4
5.8-2 Operational & Total GHG Emissions for Years 2010 and 2020 ................................ 5.8-22
5.8-3 Update to the SB 375 Greenhouse Gas Reduction Targets for SCAG ..................... 5.8-23
5.8-4 Estimated Construction Annual Greenhouse Gas Emissions ................................... 5.8-24
R:\Projects\BLC\3BLC000100\Draft EIR\!TOC.docx viii Table of Contents