Page 1332 - trc_centennial_deir201705
P. 1332

5.10  Traffic, Access, and Circulation

                                                   at intersection, approximately ¼ mile in length for the
                                                   west and east legs resulting in three through lanes in the
                                                   WB and EB directions. Additional improvements include
                                                   adding one NB left-turn lane and one SB left-turn lane
                                                   and  one  dedicated  EB  right-turn  lane.  Install  traffic
                                                   signal.  Or,  contribute  fair  share  to  intersection
                                                   improvements  being  advanced  by  Caltrans  in  the
                                                   Northwest 138 Corridor Improvement Project (specific
                                                   improvements pending Caltrans selection of a preferred
                                                   alternative). (MM 10-13 and Traffic Study MM-8)

               8. 230th St W and SR-138            Widen SR-138 to a four-lane highway from 290th Street
                                                   West to  190th  Street West. Additional improvements
                                                   include one SB left-turn lane, one SB right-turn lane and
                                                   one  EB  left-turn  lane.  Or,  contribute  fair  share  to
                                                   intersection improvements being advanced by Caltrans
                                                   in  the  Northwest  138  Corridor  Improvement  Project
                                                   (specific improvements pending Caltrans selection of a
                                                   preferred  alternative).  (MM  10-14  and  Traffic  Study
                                                   MM-9)

               9. 190th St W and SR-138            Widen SR-138 to a four-lane highway from 290th Street
                                                   West to 190th Street West with roadway augmentation
                                                   at intersection, approximately ¼ mile in length for the
                                                   west and east legs resulting in three through lanes in the
                                                   WB and EB directions. Additional improvements include
                                                   adding one EB left-turn lane, one WB left-turn lane, one
                                                   NB  left-turn  lane  and  one  SB  left-turn  lane  and  one
                                                   dedicated  EB  right-turn  lane.  Install  traffic  signal.  Or,
                                                   contribute fair share to intersection improvements being
                                                   advanced  by  Caltrans  in  the  Northwest  138  Corridor
                                                   Improvement  Project  (specific  improvements  pending
                                                   Caltrans selection of a preferred alternative). (MM 10-15
                                                   and Traffic Study MM-10)


               10. 170th St W and SR-138           Roadway augmentation at intersection, approximately ¼
                                                   mile in length for the east and west legs, resulting in two
                                                   through  lanes  in the WB  and  EB directions  at the
                                                   intersection.  Additional  improvements  include  one  EB
                                                   left-turn  lane,  one  WB left-turn lane, one NB  left-turn
                                                   lane and one SB left-turn lane. Or, contribute fair share to
                                                   intersection improvements being advanced by Caltrans
                                                   in  the  Northwest  138  Corridor  Improvement  Project
                                                   (specific improvements pending Caltrans selection of a
                                                   preferred  alternative).  (MM  10-16  and  Traffic  Study
                                                   MM-11)



               R:\Projects\PAS\CEN\000306\Draft EIR\5.10 Traffic-051217.docx   5.10-86        Centennial Project
                                                                                                     Draft EIR
   1327   1328   1329   1330   1331   1332   1333   1334   1335   1336   1337