Page 1333 - trc_centennial_deir201705
P. 1333

5.10  Traffic, Access, and Circulation

               11. 110th St W and SR-138           Roadway augmentation at intersection, approximately ¼
                                                   mile in length for the east and west legs, resulting in two
                                                   through  lanes  in the WB  and  EB directions  at the
                                                   intersection.  Additional  improvements  include  one  EB
                                                   left-turn  lane,  one  WB  left-turn  lane,  two  NB  left-turn
                                                   lanes, one SB left-turn lane and two SB right-turn lanes.
                                                   Install  traffic  signal.  Or,  contribute  fair  share  to
                                                   intersection improvements being advanced by Caltrans
                                                   in  the  Northwest  138  Corridor  Improvement  Project
                                                   (specific improvements pending Caltrans selection of a
                                                   preferred  alternative).  (MM  10-17  and  Traffic  Study
                                                   MM-12)

               12. 90th St W and SR-138            Roadway augmentation at intersection, approximately ¼
                                                   mile in length for the east and west legs, resulting in two
                                                   through  lanes  in the WB  and  EB directions  at the
                                                   intersection.  Additional  improvements  include  one  EB
                                                   left-turn  lane,  one  WB left-turn lane, one NB  left-turn
                                                   lane, and one SB left-turn lane. Or, contribute fair share
                                                   to  intersection  improvements  being  advanced  by
                                                   Caltrans  in  the  Northwest  138  Corridor  Improvement
                                                   Project  (specific  improvements  pending  Caltrans
                                                   selection  of a preferred alternative). (MM  10-18  and
                                                   Traffic Study MM-13)

               13. 60th St W and SR-138            Roadway augmentation at intersection, approximately ¼
                                                   mile in length for the east and west legs, resulting in two
                                                   through  lanes  in the WB  and  EB directions  at the
                                                   intersection.  Additional  improvements  include  one  EB
                                                   left-turn  lane,  one  WB left-turn lane, one NB  left-turn
                                                   lane, and one SB left-turn lane. Install traffic signal. Or,
                                                   contribute fair share to intersection improvements being
                                                   advanced  by  Caltrans  in  the  Northwest  138  Corridor
                                                   Improvement  Project  (specific  improvements  pending
                                                   Caltrans selection of a preferred alternative). (MM 10-19
                                                   and Traffic Study MM-14)

               14. 30th St W and SR-138            Roadway augmentation at intersection, approximately ¼
                                                   mile in length for the east and west legs, resulting in two
                                                   through  lanes  in the WB  and  EB directions  at the
                                                   intersection.  Additional  improvements  include  adding
                                                   one  EB  left-turn  lane  and  one  WB  left-turn  lane.  Or,
                                                   contribute fair share to intersection improvements being
                                                   advanced  by  Caltrans  in  the  Northwest  138  Corridor
                                                   Improvement  Project  (specific  improvements  pending
                                                   Caltrans selection of a preferred alternative). (MM 10-20
                                                   and Traffic Study MM-15)

               R:\Projects\PAS\CEN\000306\Draft EIR\5.10 Traffic-051217.docx   5.10-87        Centennial Project
                                                                                                     Draft EIR
   1328   1329   1330   1331   1332   1333   1334   1335   1336   1337   1338