Mr. Daryl J. Zerfass
                    September 18, 2008
                    Page 2




                       •  Construct  a  new  intersection  as  a  two-lane  roundabout  or  as  a conventional
                          signalized intersection at Skyline Ranch Road at Main Street South.

                       •  Plum Canvon Road at Skyline Ranch Road/Heller Circle South

                          North approach·  Restripe left-turn lane lo allow the left-turn movement.


                          East  approach:  One  left-turn  lane,  one  shared  through/left-turn  lane,  and  one
                          right-turn lane.

                          West approach·  Restripe  to  provide  one  left-turn  lane  and  one  shared
                          through/right-turn lane rather than one left-turn lane and one nght-turn lane.

                          An  adjacent development (Tentative Tract No. 46018) was conditioned  to  design
                          and  construct  the  east  approach  to  provide  one  left-1urn  lane  and  one  shared
                          through/right-turn  lane.   We  suggest  the  project's  developer  work  with  the
                          developer  of  Tentative  Tract  No.  46018  to  combine  improvements  at  the
                          intersection  and  coordinate  the  cons!ruclion  schedule  of  the  aforementioned
                          wor;1 al this 'ocation.

                   We also generally agree with the study that 1he project along with other related projects
                    in  the  area  may  significantly  impact the  County  intersection  listed  below.  The  project
                   shall  pay  its  pro-rata  share  of  the  cost  for  !he  following  recommended  mitigat'on
                   measures:

                          Plum Canyon Ro~d at Golden Valley Road/Santa Catarina Road
                                          l
                          South  approach:  Two left-turn  lanes,  one  through  lane,  and  one  right-turn  lane
                          rather than one  left-turn lane, one through lane, and one right-turn lane.

                          The project's pro-rata share is 53.2 percent.

                   For all  proposed  cumulative mitigation  measures,  a cost estimate and  conceptual  plan
                   shall be submitted to Public Works for review and approval.

                   We recommend  the  proJect's  developer  worl1  with  the  Sulphur  Springs  Union  School
                   District  to  develop  traffic  circulation  plans  and  drop-off/pick-up  procedures  for  the
                   proposed  school.       If  possible,  we   recommend  implementing  a  one-way
                   counter-clockwise on-sile traffic circulation  for any valet service  and restricting  any site
                   access  from  Skyline  Ranch  Road.      The  traffic  circulation  plan  should  inc!ude
                   informational  packets  containing  the  approved  drop-off/pick-up  procedures,  as  well  as