2 A Oh, yes, we had to shovelthere.
3 How deep did 1'0fJ. go there?
4 An averageof -about ten, twelvce,up to twenty-fiveor
5 thirty feet on the top of that so-calledconglomeratea.Ml&,.
6
Q, WEnt into the conglomerate arch twenty-fivefeet?
7 A
8
was the loosesoil and went intothe solidconglomerate aboutten
9 or twelve feetand the whole cutup therein places is as naeh as
10 twenty-fivefeet.
11
Q. On either side?
12
A Not on eitherside. On the nearestside. Offf on the
13 east side we did not have to.We were in the bed rock atonce.
14
Q. You leanedit against the hill?
15
The conglomerateis noton thewest side.
16
How about the west side?
17 On the east side--
18 Did you excavate the wholething?
19
Yes.
20
How deep?
21
It is hard to say how deep it was. The photographsand
22
the topography we have will showthat to the engineers,J'OV
23 engineersor other engineers.
24
Q. Then, this a... properthatwas resting on the solid
25
foundationwaseredted to withstanda certainpressure,wasitnot?
26 A Yes sir.
27
Q. Do you NIMllllter how much?
28 A Not in units, but it wasabout three timesthe resultant
29 that would comefrom the height of waterto fill in.
30
31
thousand feet horizontalpressureon this piece that .._ up,is
that correct?